Water & Wastewater
Tri-City WRRF Outfall project
Oregon City, OR
Water Environment Services’ progressive design-build project adds a second gravity outfall from the Tri-City WRRF in Oregon City, including roughly a half-mile of nine-foot-diameter tunnel beneath Jon Storm Park to the Willamette River. Michels Trenchless is the design-builder.
Deep Cement Mixing
Pacific Foundation Scope
Scope of Work
Pacific Foundation installed 48-inch CDSM columns with a Bauer BG40 and cored the treated columns for verification as part of the project’s ground-improvement scope.
Field Execution
Methods and Site Conditions
Next Step
Request Scope Review
Send Us Your Plans
Send the drawings, specifications, geotechnical report, pile or shaft schedule, and site constraints. Pacific Foundation can review the foundation scope and next steps.
