Water Environment Services’ progressive design-build project adds a second gravity outfall from the Tri-City WRRF in Oregon City, including roughly a half-mile of nine-foot-diameter tunnel beneath Jon Storm Park to the Willamette River. Michels Trenchless is the design-builder.

Deep Cement Mixing
Pacific Foundation Scope

Scope of Work

Pacific Foundation installed 48-inch CDSM columns with a Bauer BG40 and cored the treated columns for verification as part of the project’s ground-improvement scope.

Field Execution

Methods and Site Conditions