Transportation
Lehto Bridge
Vancouver, WA
Pacific Foundation's scope at Lehto Bridge centered on shotcrete, and soil nail walls for bridges & transportation in Vancouver, WA.
Drilled Shafts
Pacific Foundation Scope
Scope of Work
Pacific Foundation installed soil nail wall and shotcrete support for the Lehto Bridge Improvements. The slope-stabilization work reinforced the bridge approach area and addressed erosion-related deterioration at the crossing.
Field Execution
Methods and Site Conditions
Next Step
Request Scope Review
Send Us Your Plans
Send the drawings, specifications, geotechnical report, pile or shaft schedule, and site constraints. Pacific Foundation can review the foundation scope and next steps.
