Ground Anchors

Ground anchors transfer tensile loads from a structure into suitable soil or rock.

Pacific Foundation’s anchor experience includes rock anchors within secant-pile excavation support and tiedown anchors used with ground-treatment work. The supported structure, loading direction and anchoring ground determine the application and connection.

Where It Fits

01

Shoring Walls

Tieback anchors provide restraint behind a retaining or excavation wall.

02

Uplift Resistance

Tiedown anchors can resist upward forces on structures.

03

Rock or Soil

The anchor design establishes a bond zone in suitable ground.

How It Works

A steel bar or strand tendon connects a structure to a grouted bond zone in suitable ground. The free length allows the tendon to stretch during stressing; the bond zone transfers its force into soil or rock.

Anchors that restrain shoring walls are commonly called tiebacks. Tiedown anchors resist uplift. Soil nails act mainly as passive reinforcement and use different design and construction details.

Construction Planning

Confirm the anchor corridor, property rights, buried utilities and nearby foundations before drilling. The bench or platform must allow the drill to work at the specified angle and provide room for tendon handling, grouting and stressing.

Grout equipment fills the hole, and hydraulic jacks and gauges apply and measure test and lock-off loads. Required grout strength, tests and lock-off loads follow the project documents; the contract assigns witnessing, review and acceptance duties.

Installation Sequence

The designed application sets the installation and test requirements. Coordinate these stages with the supported wall or structure.

  1. Drill the Hole

    Confirm the layout and drilling corridor, then drill with the hole support required for the ground conditions.

  2. Install and Grout

    Place the specified tendon and protection components, grout the anchor and record the installation.

  3. Test and Review

    After the specified grout strength develops, complete the required tests and provide the results for the assigned review and acceptance.

  4. Stress and Lock Off

    Where the design requires a prestressed anchor, complete stressing, lock-off and protection after the required acceptance. Advance the supported work only as the approved sequence permits.

Project Experience

Lake Oswego Pump Station — Clackamas River, Oregon

Pacific installed rock anchors within the fully cased secant-pile system at Lake Oswego Pump Station on Oregon’s Clackamas River.

View Project
Shiley Marcos Center — Portland, Oregon

Pacific installed existing-wall and shoring-wall tiebacks as part of the Shiley Marcos Center support package in Portland.

View Project
Discount Tire — Clackamas, Oregon

Pacific installed the secant-pile and tieback foundation-support system for Discount Tire in Clackamas, Oregon.

View Project
Sand Island WWTP — Honolulu, Hawaii

Pacific’s Sand Island WWTP scope in Honolulu included tiedown anchors with deep cement mixing and soldier-pile work.

View Project

Related Services

Tieback Systems

Explore the wall-support application.

View Service

Common Questions

Are ground anchors and tiebacks the same?

Tiebacks are the wall-support application of ground anchors. Tiedowns resist uplift; the supported loads determine the details.

Can anchors cross a property line?

Only with the necessary rights or permissions. Utilities, foundations and other underground work also constrain the drilling corridor.

When are anchors tested?

Testing follows the specified grout-strength requirement. The required tests, review and lock-off loads follow the project documents.

Talk to an Estimator

Send the anchor drawings, geotechnical report and bid date. Include design loads, the supported structure and property-line restrictions.