Commercial & Mixed-Use
West Coast Storage
Portland, OR
West Coast Self-Storage Halsey is a 53,375-square-foot, 643-unit facility at 1530 NE 67th Avenue in Portland’s Madison South neighborhood.
Auger Cast Piles
Lagging
Soldier Pile Walls
Soldier Piles
Wood Lagging
Pacific Foundation Scope
Scope of Work
Pacific Foundation used an RTG21 to drive soldier piles, installed lagging, and used a Bauer BG24 to install displacement augercast piles for the facility.
Field Execution
Methods and Site Conditions
Methods
Service
Auger Cast Piles
Pacific Foundation brings experience from hundreds of CFA and auger cast projects to low-vibration deep foundation work across buildings, utilities, treatment plants, and infrastructure.
Method
Soldier Piles
Listed project method.
Method
Wood Lagging
Listed project method.
Site Constraints
Multiple foundation and shoring operations required coordinated equipment sequencing on an urban site.
This condition affects access, sequencing, and field coordination for the project scope. Pacific Foundation accounts for these constraints when planning equipment movement, crew access, work-area controls, and coordination with adjacent construction activity.
Quantities and Dimensions
- Auger cast piles: 214
- Pile diameter: 16 in
- Pile depth range: 15 to 45 ft
Next Step
Request Scope Review
Send Us Your Plans
Send the drawings, specifications, geotechnical report, pile or shaft schedule, and site constraints. Pacific Foundation can review the foundation scope and next steps.