At Aligned PDX01 in Hillsboro, Pacific Foundation completed the rigid-inclusion test program and installed production rigid inclusions for a data center campus.

Experience

Data Center Ground Improvement

Rigid inclusions add stiff columns to compressible soil beneath a building. The columns and surrounding soil work together to support foundation and slab loads.

Test Installations

Working for Holder Construction at Aligned PDX01, Pacific completed the rigid-inclusion test program and production installation.

Production Drilling

Pacific used two drill rigs for the Aligned PDX01 installation, including a Bauer BG55.

Load Transfer

A load-transfer platform spreads foundation and slab loads between rigid inclusions and the surrounding soil.

Services

Ground Improvement and Foundations

Rigid inclusions

Concrete or grout columns reinforce compressible ground beneath foundations and slabs. A load-transfer platform distributes loads between the inclusions and the surrounding soil.

Deep cement mixing

Mixing tools blend cement binder into the existing soil to form soil-cement columns or overlapping treatment zones. The treatment increases soil strength and stiffness below the structure.

Drilled foundations

Drilled shafts use excavated holes, reinforcing cages and concrete to form deep foundations. Micropiles use smaller drilled holes, steel reinforcement and grout, with equipment that can work in restricted spaces.

Excavation support

Soldier pile walls, lagging and tiebacks retain soil as excavation advances. Secant pile walls use overlapping concrete piles to provide earth retention and restrict groundwater flow.

Pacific Foundation field operations at Aligned PDX01 in Hillsboro
Pacific soil-mixing rig at Manzanita City Hall in Oregon
Pacific crew drilling beside the existing Oregon State Capitol building
Pacific crew working at the Press Blocks excavation shoring wall in Portland, Oregon

Discuss Your Project

Talk to an Estimator

Send the building plans, geotechnical report and bid date. Include the ground-improvement design if one has been developed.