Norton Terminal Development
Marine & Port

Norton Terminal Development

Everett, WA

Norton Terminal Development transformed a former mill site into new maritime infrastructure for the Port of Everett.

Drilled Shafts Temporary Casing Full-Depth Casing
Pacific Foundation Scope

Scope of Work

Pacific Foundation constructed the 14 large-diameter shaft foundations with casing extending the full shaft depth. The drill and crane spread supported controlled casing and reinforcement operations at the terminal site.

Field Execution

Methods and Site Conditions

Methods

Site Constraints

Marine-terminal construction required coordinated heavy equipment operations on a former mill site.

This condition affects access, sequencing, and field coordination for the project scope. Pacific Foundation accounts for these constraints when planning equipment movement, crew access, work-area controls, and coordination with adjacent construction activity.

Quantities and Dimensions

  • Drilled shafts: 14
  • Shaft diameter: 36 in
Next Step