Pacific Foundation builds deep foundations and shoring for bridges, highways and rail projects.
Experience
Bridge Foundations and Shoring
Pacific installs drilled shafts for bridge piers and overpasses, along with micropiles, retaining walls and ground anchors. At River S, crews drilled bridge foundations from a barge. At OR 217, Pacific drilled shafts and placed reinforcing cages for the Hall Boulevard overpass.
Barge-Mounted Drilling
At River S, Pacific used a Bauer BG55 on a barge, with temporary casing and slurry to support the shaft excavations.
Highway Foundations
Pacific drilled shafts and placed reinforcing cages for the Hall Boulevard overpass within the OR 217 corridor.
Rail Overpasses
Pacific installed the drilled-shaft foundations for Pioneer Street Rail Overpass in Ridgefield, Washington.
Services
Drilled Shafts
Crews excavate a shaft, place a reinforcing cage and fill it with concrete. Pacific's bridge work includes large-diameter shafts installed from a barge at River S.
Micropiles
Micropiles use small-diameter drilled holes, steel reinforcement and grout to transfer structural loads to deeper ground. Smaller drilling equipment allows installation in restricted-access areas.
Soldier Pile Walls
Steel soldier piles and lagging retain the soil as excavation advances. Tiebacks or bracing support the wall where the design requires them.
Secant & Tangent Pile Walls
A row of drilled concrete piles forms the retaining wall. Secant piles overlap; tangent piles are installed side by side.
Soil Nail Walls
Crews drill and grout steel bars into the retained ground, then install the facing as excavation advances. Soil nails reinforce the soil behind the wall.
Ground Anchors / Tiebacks
Crews drill and grout anchors beyond the potential failure zone, then test and tension them to support the shoring wall.
Featured Projects
Transportation Projects

River S Bridge Replacement
Ridgefield, WA
Pacific installed drilled shafts from a barge for the bridge replacement.

Little Pudding Creek Bridge
Silverton, OR
Pacific installed drilled shafts for the replacement crossing within the permitted in-water work window.

Pioneer Street Rail Overpass
Ridgefield, WA
Pacific installed drilled-shaft foundations for the rail overpass.

OR 217 – Hall Blvd Overpass
Beaverton, OR
Pacific drilled shafts and placed reinforcing cages for the Hall Boulevard overpass.