OR 217 – Hall Blvd Overpass
Transportation

OR 217 – Hall Blvd Overpass

Beaverton, OR

OR 217 Cascade Scope is a transportation infrastructure project in Beaverton, Oregon.

Drilled Shafts Temporary Casing Reinforcement Cage Installation Grouting
Pacific Foundation Scope

Scope of Work

Pacific Foundation worked between the OR 217 highway lanes to drill shafts and place reinforcing cages for the new Hall Boulevard overpass. The work took place within the constrained highway corridor as the existing overpass was replaced to accommodate new OR 217 auxiliary lanes. Pacific’s scope focused on the drilled-shaft foundations supporting the replacement structure, with reinforcing-cage placement coordinated for the bridge work. The completed overpass adds wider sidewalks and bicycle lanes, ADA-compliant ramps, and greater earthquake resiliency.

Field Execution

Methods and Site Conditions

Methods

Service Drilled Shafts Large-diameter drilled foundations for structures that need deep support, high load transfer, lateral resistance, or low-vibration installation through difficult ground.
Method Temporary Casing Listed project method.
Method Reinforcement Cage Installation Listed project method.
Method Grouting Listed project method.