Utilities & Energy
Port of Vancouver LaFarge Modifications
Vancouver, WA
Port of Vancouver LaFarge Modifications supported rail and freight infrastructure improvements within the West Vancouver Freight Access program.
Drilled Shafts
Temporary Casing
Large-Diameter Drilled Shafts
Full-Length Temporary Casing
Tremie Placement
Pacific Foundation Scope
Scope of Work
Pacific Foundation constructed the large-diameter shafts through saturated sands, gravels, cobbles, and obstructions. Full-length casing controlled the excavations, and concrete was placed by tremie.
Field Execution
Methods and Site Conditions
Methods
Site Constraints
Saturated sands, gravels, cobbles, and obstructions required full-length casing.
Quantities and Dimensions
- Drilled shafts: 7
- Shaft diameter: 60 in
- Maximum depth: 70 ft
Next Step
Request Scope Review
Send Us Your Plans
Send the drawings, specifications, geotechnical report, pile or shaft schedule, and site constraints. Pacific Foundation can review the foundation scope and next steps.