Skip to main content
SERVING:
Need help? 360.200.6608
Port of Vancouver LaFarge Modifications
Utilities & Energy

Port of Vancouver LaFarge Modifications

Vancouver, WA

Port of Vancouver LaFarge Modifications supported rail and freight infrastructure improvements within the West Vancouver Freight Access program.

Drilled Shafts Temporary Casing Large-Diameter Drilled Shafts Full-Length Temporary Casing Tremie Placement
Pacific Foundation Scope

Scope of Work

Pacific Foundation constructed the large-diameter shafts through saturated sands, gravels, cobbles, and obstructions. Full-length casing controlled the excavations, and concrete was placed by tremie.

Field Execution

Methods and Site Conditions

Methods

Method Large-Diameter Drilled Shafts
Method Full-Length Temporary Casing
Method Tremie Placement

Site Constraints

Saturated sands, gravels, cobbles, and obstructions required full-length casing.

Quantities and Dimensions

  • Drilled shafts: 7
  • Shaft diameter: 60 in
  • Maximum depth: 70 ft
Next Step

Send Us Your Plans

Send the drawings, specifications, geotechnical report, pile or shaft schedule, and site constraints. Pacific Foundation can review the foundation scope and next steps.

Request Scope Review