Port of Vancouver LaFarge Modifications supported rail and freight infrastructure improvements within the West Vancouver Freight Access program.

Drilled Shafts Temporary Casing Large-Diameter Drilled Shafts Full-Length Temporary Casing Tremie Placement
Pacific Foundation Scope

Scope of Work

Pacific Foundation constructed the large-diameter shafts through saturated sands, gravels, cobbles, and obstructions. Full-length casing controlled the excavations, and concrete was placed by tremie.

Field Execution

Methods and Site Conditions

Methods

Method Large-Diameter Drilled Shafts Listed project method.
Method Full-Length Temporary Casing Listed project method.
Method Tremie Placement Listed project method.

Site Constraints

Saturated sands, gravels, cobbles, and obstructions required full-length casing.

This condition affects access, sequencing, and field coordination for the project scope. Pacific Foundation accounts for these constraints when planning equipment movement, crew access, work-area controls, and coordination with adjacent construction activity.

Quantities and Dimensions

  • Drilled shafts: 7
  • Shaft diameter: 60 in
  • Maximum depth: 70 ft