Port of Vancouver LaFarge Modifications
Vancouver, WA
Port of Vancouver LaFarge Modifications supported rail and freight infrastructure improvements within the West Vancouver Freight Access program.
Scope of Work
Pacific Foundation constructed the large-diameter shafts through saturated sands, gravels, cobbles, and obstructions. Full-length casing controlled the excavations, and concrete was placed by tremie.
Methods and Site Conditions
Methods
Site Constraints
Saturated sands, gravels, cobbles, and obstructions required full-length casing.
This condition affects access, sequencing, and field coordination for the project scope. Pacific Foundation accounts for these constraints when planning equipment movement, crew access, work-area controls, and coordination with adjacent construction activity.
Quantities and Dimensions
- Drilled shafts: 7
- Shaft diameter: 60 in
- Maximum depth: 70 ft