Earth Retention and Shoring
Earth retention supports the ground around an excavation so below-grade work can proceed beside buildings, roads and utilities.
Pacific Foundation’s project experience includes soldier pile and lagging walls, anchored shoring, secant walls, soil nails and shotcrete, and temporary sheet-pile support. The methods serve different ground and construction conditions; their value depends on how the wall, excavation and surrounding work are coordinated.
Compare Shoring Systems
Start with the excavation, the surrounding ground and the space available for support. A wall, its anchors and its facing perform different roles.
Soldier Pile Walls
Steel piles and lagging retain soil as excavation advances in supported lifts. Groundwater needs separate evaluation.
View ServiceSecant Pile Walls
Overlapping drilled piles form a wall before excavation. Pile continuity and the complete water-control design govern seepage performance.
View ServiceSheet Pile Shoring
Interlocking sheets form the excavation boundary. Driveability, vibration, handling space and designed support levels affect the work.
View ServiceSoil Nail Walls
Passive reinforcement and the specified facing support suitable ground as a cut is built from the top down.
View ServiceGround Anchors
Anchors transfer tensile loads into soil or rock. Tiebacks are the wall-support application; tiedowns resist uplift.
View ServiceTieback Systems
Prestressed anchors restrain a wall and can reduce the need for supports inside the excavation where ground and anchor rights permit.
View ServiceStructural Shotcrete
Sprayed concrete forms the specified structural facing for an engineered excavation-support system.
View ServiceWhere It Fits
Below-Grade Buildings
Shoring supports excavation where space does not permit sloped cuts.
Existing Work
Walls retain ground beside buildings, roads and utilities.
Water-Bearing Ground
Continuous barriers and ground treatment can form part of the water-control system.
How It Works
Earth-retention systems hold back soil while excavation and below-grade construction proceed. Pacific’s project experience includes soldier pile and lagging walls, secant-pile walls, temporary sheet-pile support, soil nails and anchors.
Some walls are installed before excavation; others are built in stages as the face is exposed. Groundwater control may require drainage, a cutoff, a bottom seal or separate pumping.
A retaining wall and a groundwater-control system address related but different requirements. Lagging is not a continuous cutoff. Secant and sheet-pile walls may reduce inflow, but joints, penetrations, wall ends and flow beneath the toe still need evaluation. Drainage, treatment, bottom seals or separate pumping may be required by the design.
Planning and Installation
Retained height, surcharge loads and allowable movement establish the wall’s demands. Groundwater, soil behavior and nearby foundations affect which systems are practical.
The working area must accommodate installation and the excavation that follows. Tiebacks need an available corridor behind the wall; internal bracing occupies space inside the cut. Excavation stages, lifting, deliveries and access for following trades belong in the same construction plan.
An excavation wall retains ground; underpinning changes or supplements the support beneath an existing foundation. Where adjacent excavation or structural alterations affect a building, the foundation load path and support sequence need their own review.
Underpinning
Explore existing-foundation support and staged load transfer.
Project Experience
Pacific installed soldier piles and lagging, with jet grouting and rigid inclusions, at Block 1 Apartments in Vancouver, Washington.
View ProjectPacific installed soil nails and applied shotcrete for ground support at the Bull Run Water Filtration Facility in Gresham, Oregon.
View ProjectPacific’s Washington Park Reservoir scope in Portland included soil-nail walls, temporary and permanent soldier-pile walls and tieback anchors.
View ProjectPacific installed temporary sheet piles for the Bull Run Pipeline S-03 package in Gresham, Oregon, then removed them after the supported work.
View ProjectAt Press Blocks in Portland, Pacific installed soldier piles, tiebacks and lagging for the excavation-support system.
View ProjectAt HKV Ka Haku Tower in Honolulu, Pacific’s scope included a design-build secant-pile wall, deep cement mixing and jet-grout bottom-seal work.
View ProjectFor the Oregon Capitol CAMS III work in Salem, Pacific installed low-clearance micropiles and steel towers supporting the project’s jacking and base-isolation sequence.
View ProjectCommon Questions
What determines the wall type?
Excavation depth, ground conditions, groundwater and allowable movement determine the design. Property rights can also limit anchors behind the wall.
Does a shoring wall control groundwater?
Some walls reduce inflow; others leave open ground between piles. A separate groundwater-control system may be needed.
Can shoring remain permanently?
Yes, when it is designed and detailed for permanent service. Temporary walls have different service-life requirements.
Talk to an Estimator
Send the shoring drawings, geotechnical report and bid date. Include the excavation depth, planned stages and known restrictions around the site.
