Lower Granite Dam is an electric power infrastructure project in Pullman, WA. Pacific Foundation supported the work with drilled shafts and micropiles.
Highlights
Lower Granite Dam is an electric power infrastructure project in Pullman, WA. The Lower Granite Dam work upgraded foundation and marine support elements for a major dam and hydropower facility. The project also included 12 permanent micropile anchors embedded into rock for a 15-foot-diameter mooring dolphin, with half of the main shafts installed over water from work trestles. Pacific Foundation installed 32 drilled shafts, each 54 inches in diameter, with 48-inch-diameter rock sockets. The shafts were installed over water through overburden and hard bedrock.
Scope of Work
Pacific Foundation installed 32 drilled shafts, each 54 inches in diameter, with 48-inch-diameter rock sockets. The shafts were installed over water through overburden and hard bedrock.
Methods and Site Conditions
Methods
Send Us Your Plans
Send the drawings, specifications, geotechnical report, pile or shaft schedule, and site constraints. Pacific Foundation can review the foundation scope and next steps.