Pacific Foundation | Geotechnical Excellence

a
Deep Foundations

CFA / Auger Cast Piles

Pacific Foundation installs CFA piles for building and infrastructure foundations.

CFA piles are concrete or grout foundations formed with a continuous-flight auger. They transfer structural loads into supporting ground below the near-surface soils. Pacific’s capabilities include CFA foundation work alongside excavation shoring on constrained sites.

Applications

Where It Fits

01

Building Foundations

CFA piles provide deep support beneath buildings and other structures.

02

Repeated Pile Layouts

Continuous drilling and placement can suit foundations with many similar elements.

03

Nearby Structures

Drilling can be useful beside existing improvements where vibration and ground movement remain within the project limits.

The Method

How It Works

CFA piles, also called auger cast piles, are drilled with a continuous hollow-stem auger. The auger advances to the specified depth, carrying excavated soil toward the surface. Concrete or grout is then pumped through the stem as the auger is withdrawn. Reinforcement is inserted into the fresh material before it loses workability.

The completed pile transfers structural loads through resistance along its sides, bearing at its base, or both, as established by the pile design and ground profile. Its connection to the pile cap or structure is part of the foundation detailing.

The installation avoids leaving a conventional open borehole for later concrete placement. It generally produces less vibration than impact-driven piling, while still requiring control of drilling and placement to limit disturbance to the surrounding ground. Conventional CFA brings soil to the surface; displacement CFA uses different tooling to displace much of the soil laterally.

Construction Planning

A CFA pile is formed as drilling changes directly into pumping and withdrawal. The concrete or grout supply must support continuous placement, with delivery routes, pump position and backup arrangements addressed before installation. Withdrawal and pumping must remain coordinated so the pile fills as the auger leaves the ground.

The pile layout also needs room for the rig, spoil removal and reinforcement handling. Obstructions, coarse material and the depth or stiffness of the bearing layer can affect drilling and the suitability of CFA. Reinforcement length and congestion matter because the cage must enter the fresh pile; the design and installation plan need to resolve that detail together.

Define responsibility for the working platform, concrete access, spoil removal and pile-cap excavation before installation.

Verification

Installation and Testing

Because the pile forms below ground during auger withdrawal, installation records provide an important account of the work. The project specifications establish the required monitoring, tests and acceptance responsibilities.

Placement Records Depth, pumped volume and the recorded withdrawal and placement parameters help the project team compare installation with the specified procedure. Unusual readings need review in the context of the ground and the pile.
Integrity Testing Specified integrity methods assess features of the installed pile. Their coverage and interpretation depend on the test method; an integrity result is different from a load-capacity test.
Load Testing A specified test pile or production-pile load test evaluates response under the test arrangement and loading. The engineer and contract requirements govern how those results apply to the foundation.
Selected Work

Project Experience

UO Indoor Football Facility

Pacific installed CFA shafts for the University of Oregon indoor football facility as part of a package that also included micropiles and tiedowns.

Three Rivers WWTP project work. Three Rivers WWTP

Pacific installed CFA shafts for treatment and solids-handling structures at the Three Rivers Wastewater Treatment Plant in Longview.

View Project
Sand Island WWTP — CFA package project work. Sand Island WWTP — CFA package

Pacific installed CFA piles for the Sand Island Wastewater Treatment Plant foundation package in Honolulu.

View Project
Nike Merchandising

Pacific installed CFA foundations in saturated soils for the Nike Merchandising project.

Foundation drilling at Adventist Health in Tillamook. Adventist Health — Tillamook

Pacific installed CFA foundations for the Adventist Health project in Tillamook, including a test pile and production shafts.

Julia West House project work. Julia West House

Pacific installed CFA shafts, soldier piles, lagging and tiebacks on a constrained downtown Portland site.

View Project
Equipment

Installation Equipment

The installation combines a continuous-flight-auger rig, pumping equipment and concrete or grout supply. The platform must support the rig and the movements required to reach each pile; pump access and delivery traffic need to remain workable as the pile pattern develops.

Excavators or other support equipment clear auger spoils, while lifting equipment handles reinforcement. Those operations need enough separation and laydown space to support the drilling and placement cycle. At Three Rivers WWTP, Pacific used a BG 33 drill with a supporting crane for its CFA foundation scope.

Related Services

Related Services

The pile connection, ground profile and construction requirements help distinguish these foundation methods.

FAQ

Common Questions

Are CFA and auger cast piles different?

The names describe the same general continuous-flight-auger process. The specified material may be concrete or grout, and reinforcement and installation requirements follow the foundation design.

How does CFA differ from displacement CFA?

Conventional CFA brings excavated soil to the surface along the auger flights. Displacement tooling moves much of the soil sideways. The different installation effects, ground conditions and design requirements need to be evaluated for the project.

Can CFA piles be installed beside existing structures?

Drilled installation can be useful where impact-driving vibration is a concern. Suitability still depends on the ground, clearance, pile layout and allowable movement. The project may require monitoring of nearby improvements.

What information is needed to price the work?

Send the pile schedule, structural details, geotechnical report and specifications, including monitoring and testing. Identify the working-platform and spoil-removal responsibilities, reinforcement requirements and available installation access.

Talk to an Estimator
Scope Review

Talk to an Estimator

Send the pile plans, geotechnical report and bid date. Include the pile schedule and testing requirements when available.