Deep Foundations

Auger Cast Piles

Auger cast piles provide drilled, cast-in-place support with low vibration and repeatable production where the ground and site logistics fit continuous installation.

Pacific Foundation brings experience from hundreds of CFA and auger cast projects to low-vibration deep foundation work across buildings, utilities, treatment plants, and infrastructure.

Low vibration Drilled pile installation for sites where driven-pile vibration creates risk for structures, utilities, or adjacent work.
Continuous placement Concrete or grout is placed as the auger withdraws, so production depends on steady material flow.
No open hole The pile forms without leaving an unsupported drilled hole open during installation.
Field records Material use, reinforcement placement, testing, and pile logs have to match the pile as built.
Method Overview

Drilling and Grout in a Single Stroke

Auger cast piles—also called continuous flight auger (CFA) or augered cast-in-place (ACIP) piles—are formed with a hollow-stem continuous flight auger. Concrete or grout is pumped through the stem as the auger withdraws, and reinforcement is placed while the material is fresh. The method supports fast, repeatable installation with low vibration and no conventional open borehole.

Pacific Foundation has installed CFA piles on hundreds of projects across commercial, housing, healthcare, institutional, industrial, utility, water and wastewater, and infrastructure work.

Where They Fit

Use auger cast piles where continuous production fits the site

Method selection · 01–06

Auger cast piles are often selected when a project needs repeated deep foundation support without the vibration profile of driven piles. They are especially useful where production, access, and foundation sequencing need to stay coordinated.

01

Building foundations

Repeated pile elements for commercial, residential, institutional, industrial, and public works structures.

02

CFA soldier piles

Excavation support where the design, soil profile, and access support auger installation.

03

Vibration-sensitive sites

Work near existing structures, utilities, public corridors, or occupied facilities.

04

Variable ground

Sites where the crew has to read drilling response and keep placement continuous.

05

Urban access

Infill, campus, utility, and treatment plant work where production has to fit the site.

06

Fast sequencing

Foundation packages where pile installation has to keep pace with the next phase.

Field Conditions

Match the rig, tooling, and pump setup to the ground

CFA installation depends on soil conditions, auger tooling, working-platform capacity, spoil handling, pump location, material continuity, reinforcement timing, and access. Pacific reviews those controls before production starts.

Bauer BG 33 H Bauer BG 33 H

Heavy vertical drill rig used for CFA tooling, drilled foundation work, and production pile installation where pile size, access, and sequencing need coordinated field control.

View equipment
Bauer BG 24 H Bauer BG 24 H

The Bauer BG 24 H is a mid-size H-kinematics vertical drill rig for drilled foundation and shoring work.

View equipment
Bauer BG 46/55 V #3490 Bauer BG 46/55 V #3490

The Bauer BG 46/55 V is a heavy vertical drill platform for large-hole and specialty foundation drilling.

View equipment
Bauer BG 15 H #3061 Bauer BG 15 H #3061

The Bauer BG 15 H is a compact foundation rig configured for drilling on constrained sites.

View equipment
Selected Work

Cross-Market Experience

Deep field experience across buildings, active facilities, industrial sites, utilities, treatment plants, shoring scopes, and infrastructure work.

Julia West House Portland, OREGON / General Civil Julia West House

Pacific Foundation installed soldier piles, CFA shafts, lagging, and tiebacks for Julia West House on a constrained downtown Portland site.

View project
Three Rivers WWTP Longview, WA / Water & Wastewater Treatment Three Rivers WWTP

Pacific Foundation installed CFA shafts for the Three Rivers Wastewater Treatment Plant upgrades using a BG 33 drill and supporting crane.

View project
OSU Reser Stadium Corvallis, OR / Stadiums & Arenas OSU Reser Stadium

Pacific Foundation drilled conventional and CFA shafts, including low-clearance work with a Bauer BG12H; built a tied-back soldier-pile wall for excavation support; and designed and installed micropiles to underpin...

View project
Adventist Health Tillamook Tillamook, OR / Healthcare Adventist Health Tillamook

Pacific Foundation installed continuous flight auger piles for the hospital expansion and surgery-department improvements.

View project
Willamette River Bridge Portland, OR / Bridges & Transportation Willamette River Bridge

Pacific Foundation installed permanent soldier piles near the east abutment of the Willamette River Bridge package. The retaining work supported excavation and foundation operations at the bridge landing.

View project
OR-1 Data Center Hillsboro, OR / Data Centers OR-1 Data Center

Pacific Foundation installed 1,879 rigid inclusions to depths of 52.5 feet using multiple Bauer drill rigs for the first-phase data center building.

View project
U of O Hayward Field Eugene, OR / Stadiums & Arenas U of O Hayward Field

U of O Hayward Field is a stadium and public assembly project in Eugene, OR.

View project
Southwest Idaho Veterans Home Boise, ID / Healthcare Southwest Idaho Veterans Home

Pacific Foundation installed conventional drilled shafts, including 24 documented 42-inch reinforcement cages, and aligned cast-in embeds at footing level.

View project
FAQ

Auger Cast Pile Planning Questions

How do CFA and auger cast relate?

CFA describes the continuous flight auger installation method. Auger cast or augered cast-in-place describes the pile formed as concrete or grout is placed during auger withdrawal.

When does Pacific recommend auger cast piles?

Pacific recommends CFA when the project needs repeated drilled elements, reduced vibration, and production installation without an unsupported open hole. The ground still has to support continuous drilling and placement.

What conditions can make CFA a poor fit?

Dense gravel, cobbles, obstructions, difficult reinforcement, interrupted material supply, or access that prevents steady production can push the work toward another foundation method.

Can CFA be used for shoring?

Yes. CFA-installed soldier piles can be used for excavation support when the design, ground conditions, access, and installation sequence support the method.

What should we send for pricing?

Send the plans, pile schedule, geotechnical report, load requirements, access constraints, clearance limits, and testing requirements. Pacific can price a defined CFA scope or flag method-fit risks.

Review the pile scope before production is set
Scope Review

Review the pile scope before production is set

Send the plans, pile layout, geotechnical report, and schedule. Include access, material delivery, reinforcement, and testing so Pacific can review the production sequence before mobilization.