Progressive Design

Early Involvement

Progressive Design

Pacific Foundation brings installation experience into foundation and shoring discussions as the design develops.

Early input can identify the working area, access and construction sequence a proposed system requires. Pacific reviews these requirements with the GC and design team so they can be addressed in the drawings and bid scope.

Rig AccessIdentify the access route and working area needed for drilling or pile installation.
Excavation SequenceReview when shoring, anchors and foundation work can be installed as excavation advances.
Material HandlingAccount for reinforcement, concrete delivery, spoil removal and storage around the work.
Testing RequirementsInclude the installation tests and inspection access required by the project.
Why Early

Installation Input During Design

A foundation detail may require more working room than the site provides. An anchor may affect an adjacent property, or a shoring sequence may control when excavation can advance. Discussing these issues during design gives the project team time to develop the details and construction sequence.

When to Start

Start when the team has concept plans or an initial foundation or shoring approach to discuss. Final construction drawings are not required for an initial conversation.

What To Send

Send concept plans or current drawings, geotechnical information, project location, known constraints, target schedule, and the method currently assumed.

Method Fit

Questions to Resolve

For drilled foundations, review rig access, headroom and reinforcement handling. For shoring, review wall installation, anchor access and excavation stages. These questions help the design team account for the way the specialty work will be installed.

Coordination

From Discussion to Scope

The discussion identifies installation requirements, open questions and assumptions for estimating. The GC and design team can then incorporate the agreed requirements into the drawings, specifications and construction sequence.

Common Questions

Is Progressive Design the same as Value Engineering?

No. The two can overlap, but this page is focused on early involvement while the method, constraints, or delivery path is still forming. Value Engineering is more narrowly about reviewing a scope or alternative for constructability and method fit.

Does Pacific take over the design?

No. This page describes constructability and specialty foundation input. Formal design responsibility, delegated design, or stamped engineering authority must be defined separately.

Can this lead to a bid?

Yes, if the information becomes defined enough for estimating. The review may also show that the team needs more geotechnical information, clearer criteria, or a service-specific method review first.

Start Early

Send The Information You Have

Send concept plans or current drawings, geotechnical information, project location, the method being considered, schedule or work-window constraints, and the decision the team is trying to make.