The City of Caldwell replaced the Ustick Road crossing over Indian Creek, added sidewalk access, widened Ustick to two lanes in each direction with a center median between the railroad and Crow Drive, and improved the railroad crossing.
Scope of Work
Working for Tapani, Pacific Foundation installed 50 galvanized HP12×53 piles in drilled foundation holes, each with a 7-foot reinforced rock socket and gravel backfill above. The package included 50 bottom reinforcement cages and 75 cubic yards of 5,000-psi concrete, with a Bauer BG24 supporting the installation.
Methods and Site Conditions
Methods
Site Constraints
Creek-adjacent work area
This condition affects access, sequencing, and field coordination for the project scope. Pacific Foundation accounts for these constraints when planning equipment movement, crew access, work-area controls, and coordination with adjacent construction activity.
Services and equipment
Send Us Your Plans
Send the drawings, specifications, geotechnical report, pile or shaft schedule, and site constraints. Pacific Foundation can review the foundation scope and next steps.