Indian Creek at Ustick
Bridges & Transportation

Indian Creek at Ustick

Caldwell, ID

The City of Caldwell replaced the Ustick Road crossing over Indian Creek, added sidewalk access, widened Ustick to two lanes in each direction with a center median between the railroad and Crow Drive, and improved the railroad crossing.

Drilled Shafts Drilled Rock Sockets H-Pile Foundations
Pacific Foundation Scope

Scope of Work

Working for Tapani, Pacific Foundation installed 50 galvanized HP12×53 piles in drilled foundation holes, each with a 7-foot reinforced rock socket and gravel backfill above. The package included 50 bottom reinforcement cages and 75 cubic yards of 5,000-psi concrete, with a Bauer BG24 supporting the installation.

Field Execution

Methods and Site Conditions

Methods

Method Drilled Rock Sockets Listed project method.
Method H-Pile Foundations Listed project method.

Site Constraints

Creek-adjacent work area

This condition affects access, sequencing, and field coordination for the project scope. Pacific Foundation accounts for these constraints when planning equipment movement, crew access, work-area controls, and coordination with adjacent construction activity.