Pearl Harbor Arizona Memorial
Marine & Port

Pearl Harbor Arizona Memorial

Honolulu, HI

The National Park Service’s 2022 shoreside-dock replacement at the Pearl Harbor National Memorial visitor center renewed the embarkation dock, gangways, and mooring system used for visitor access to the USS Arizona Memorial. Hawk Contracting Group led the work.

Jet Grouting Secant Piles
Pacific Foundation Scope

Scope of Work

Working for Hawk Contracting Group, Pacific Foundation installed 36-inch drilled shafts with sectional casing and structural concrete for the shoreside-dock replacement. A Bauer BG22 handled shaft installation, followed by pile-integrity testing (PIT).