Pearl Harbor Arizona Memorial
Honolulu, HI
The National Park Service’s 2022 shoreside-dock replacement at the Pearl Harbor National Memorial visitor center renewed the embarkation dock, gangways, and mooring system used for visitor access to the USS Arizona Memorial. Hawk Contracting Group led the work.
Jet Grouting
Secant Piles
Pacific Foundation Scope
Scope of Work
Working for Hawk Contracting Group, Pacific Foundation installed 36-inch drilled shafts with sectional casing and structural concrete for the shoreside-dock replacement. A Bauer BG22 handled shaft installation, followed by pile-integrity testing (PIT).
Field Execution
Methods and Site Conditions
Methods
Next Step
Request Scope Review
Send Us Your Plans
Send the drawings, specifications, geotechnical report, pile or shaft schedule, and site constraints. Pacific Foundation can review the foundation scope and next steps.