General Civil
Rock Creek AWWTF
Hillsboro, OR
Rock Creek AWWTF refers to the Rock Creek Advanced Wastewater Treatment Facility in Hillsboro, which is operated by Clean Water Services.
CFA Piles Drilled Shafts
Pacific Foundation Scope
Scope of Work
Pacific Foundation drilled twenty 24-inch CFA shafts to depths of about 70 feet for the Rock Creek AWWTF project. The work also included installing reinforcing cages for the deep foundation system.
Field Execution
Methods and Site Conditions
Methods
Next Step
Request Scope Review
Send Us Your Plans
Send the drawings, specifications, geotechnical report, pile or shaft schedule, and site constraints. Pacific Foundation can review the foundation scope and next steps.
