Skip to main content
SERVING:
Need help? 360.200.6608
Rock Creek AWWTF
General Civil

Rock Creek AWWTF

Hillsboro, OR

Rock Creek AWWTF refers to the Rock Creek Advanced Wastewater Treatment Facility in Hillsboro, which is operated by Clean Water Services.

CFA Piles Drilled Shafts
Pacific Foundation Scope

Scope of Work

Pacific Foundation drilled twenty 24-inch CFA shafts to depths of about 70 feet for the Rock Creek AWWTF project. The work also included installing reinforcing cages for the deep foundation system.

Field Execution

Methods and Site Conditions

Methods

Method CFA Piles Drilled Shafts Listed project method.
Next Step

Send Us Your Plans

Send the drawings, specifications, geotechnical report, pile or shaft schedule, and site constraints. Pacific Foundation can review the foundation scope and next steps.

Request Scope Review