Drilled Shafts
Pacific Foundation Scope
Scope of Work
Pacific Foundation installed eight drilled shafts for the Wapato Creek bridge project, with 24-inch shafts installed as 30-inch shafts to depths of 79 feet. The crew worked under low-overhead constraints at the west abutment, used full-depth temporary casing, and set spliced cages before concrete placement.
Field Execution
Methods and Site Conditions
Next Step
Request Scope Review
Send Us Your Plans
Send the drawings, specifications, geotechnical report, pile or shaft schedule, and site constraints. Pacific Foundation can review the foundation scope and next steps.