Wapato Creek Bridge Tacoma
Bridges & Transportation

Wapato Creek Bridge Tacoma

Tacoma, WA

This row aligns with the Wapato Creek bridge package at Tacoma's Pierce County Terminal.

Drilled Shafts
Pacific Foundation Scope

Scope of Work

Pacific Foundation installed eight drilled shafts for the Wapato Creek bridge project, with 24-inch shafts installed as 30-inch shafts to depths of 79 feet. The crew worked under low-overhead constraints at the west abutment, used full-depth temporary casing, and set spliced cages before concrete placement.

Field Execution

Methods and Site Conditions

Next Step

Send Us Your Plans

Send the drawings, specifications, geotechnical report, pile or shaft schedule, and site constraints. Pacific Foundation can review the foundation scope and next steps.

Request Scope Review