Solar Foundations
A solar foundation transfers loads from the array’s support structure into the ground. Pacific Foundation’s Hawaii solar work includes driven test-pile installation for a proposed solar and battery-storage development.
Solar Construction
Installation Coordination
Layout and Ground Conditions
Review the array layout, foundation details and geotechnical report together. The project documents establish foundation locations, alignment, embedment and installation tolerances. Rock, obstructions and variations across the site need to be addressed in the installation requirements.
Access and Sequence
Foundation installation needs workable routes for equipment and material deliveries across the array. Coordinate survey control, grading, foundation work and access for the crews installing the racking. Confirm how installation issues will be documented and referred for design review before they interrupt successive rows.
Testing and Handover
The specifications establish the required tests, installation records and acceptance criteria. Where preproduction testing is required, allow for the test work and review before production. Confirm responsibility for testing, survey checks and the release of completed foundations to follow-on trades.
Selected Work
Project Experience
Kaawanui PV + BESS
Pacific completed preconstruction driven test-pile work for Kaawanui PV + BESS on Kaua‘i in February 2025. The assignment supported the geotechnical investigation for the proposed solar and battery-storage development.