Specialty Markets

Solar Foundations

A solar foundation transfers loads from the array’s support structure into the ground. Pacific Foundation’s Hawaii solar work includes driven test-pile installation for a proposed solar and battery-storage development.

Solar Construction

Installation Coordination

Layout and Ground Conditions

Review the array layout, foundation details and geotechnical report together. The project documents establish foundation locations, alignment, embedment and installation tolerances. Rock, obstructions and variations across the site need to be addressed in the installation requirements.

Access and Sequence

Foundation installation needs workable routes for equipment and material deliveries across the array. Coordinate survey control, grading, foundation work and access for the crews installing the racking. Confirm how installation issues will be documented and referred for design review before they interrupt successive rows.

Testing and Handover

The specifications establish the required tests, installation records and acceptance criteria. Where preproduction testing is required, allow for the test work and review before production. Confirm responsibility for testing, survey checks and the release of completed foundations to follow-on trades.

Selected Work

Project Experience

Kaawanui PV + BESS

Pacific completed preconstruction driven test-pile work for Kaawanui PV + BESS on Kaua‘i in February 2025. The assignment supported the geotechnical investigation for the proposed solar and battery-storage development.

Discuss Your Project

Discuss Your Solar Scope

Send the array layout, foundation requirements, geotechnical report and bid date. Include the construction schedule and available installation access.