Scope Comparison

Value Engineering

Pacific Foundation compares foundation, shoring and ground-improvement options with project teams.

Value engineering compares alternatives for the same project requirements, including their cost and construction implications. Pacific evaluates the installation method and the excavation, reinforcement, groundwater-control and testing work associated with each option.

Foundation Options

Compare installation requirements for the specified system and proposed alternatives.

Excavation Support

Consider how shoring, groundwater cutoff and bottom support work together.

Construction Sequence

Account for excavation stages and the work that follows each installation.

Estimate Assumptions

Define the quantities, testing and site conditions used to price an option.

Comparing Options

What the Review Covers

A lower unit price does not describe the whole foundation scope. A change in method can also change excavation, spoil handling, reinforcement, groundwater control and testing. Pacific reviews those construction requirements with the project team when comparing an alternative.

When to Start

Bring an alternative to Pacific while the design and bid scope can still be developed. The team can also review a specified system during estimating.

What to Send

Share the drawings, geotechnical report and specifications, along with the option you want to compare.

Estimating

Developing an Alternative

The responsible project team must develop and accept any design changes before construction.

Project Experience

Project Experience

Sand Island WWTP — IPS Bottom Seal

Pacific developed a value-engineered CDSM bottom-seal system for the Sand Island wastewater excavation.

View Project

BNSF 66.4 White Salmon Bridge

Pacific developed a micropile foundation solution for the BNSF White Salmon Bridge, addressing boulders, basalt and rail-corridor constraints.

View Project

St. Charles Healthcare

Pacific developed alternative CFA foundation and soil-nail shoring approaches for the St. Charles healthcare project.

Sweet Creek Retaining Wall

Pacific developed a revised foundation and shoring approach for the Sweet Creek retaining wall in response to site ground conditions.

PCC Cascade

Pacific used CFA installation in place of slurry and casing systems for the PCC Cascade foundation package.

Common Questions

Can Pacific review a specified foundation system?

Yes. Send the bid package and identify the system or alternate you want to discuss. Pacific can review the installation requirements and estimating assumptions.

Can an alternative combine several methods?

Yes. Sand Island’s scope combined CFA piles, CDSM, soldier piles and tiedown anchors for different parts of the work. The comparison should account for how the systems interact.

Will the review always produce a different method?

The specified method may remain appropriate. The purpose of comparing options is to understand their construction requirements and cost implications before selecting one.

Talk with Pacific

Talk to an Estimator

Share the project location, scope and bid date. Include drawings and a geotechnical report when available.