Cape Station Phase II

Cape Station Phase II

At Fervo Energy’s Cape Station Phase II development near Milford, Utah, Pacific Foundation installed auger cast piles for Industrial Builders to support the geothermal power facility.

Tower Solar

Tower Solar

Pacific Foundation installed drilled shafts with project-specific top-of-shaft alignment and finishing requirements for Tower Solar near Boardman, Oregon.

Pilot Butte Substation

Pilot Butte Substation

Pacific Foundation’s scope at Pilot Butte Substation centered on jet grouting for utilities & energy in Bend, OR.

Pilot Butte Substation

Avista Metro Substation Phase 2

Pacific Foundation’s scope at Avista Metro Substation Phase 2 centered on large-diameter drilled shafts, deep foundation drilling for utilities & energy in Spokane, WA.

Port of Vancouver LaFarge Modifications

Port of Vancouver LaFarge Modifications

This project included the installation of 60” diameter drilled shafts in saturated sands using full length temporary casing and vibratory hammer for installation and extraction of the casing.