Projects

Dams & Ports

Specialty geotechnical construction for dam, dock, wharf, and port improvements—where deep foundations, earth retention, ground improvement, and constrained access must work as one coordinated package.

Overview

Foundation Work at the Water’s Edge

Dam and marine infrastructure place specialty foundation work at the intersection of water, difficult access, saturated ground, existing utilities, and active operations. Pacific Foundation brings deep foundations, earth retention, and ground improvement methods to those conditions with field planning matched to the structure and construction sequence.

Over-Water Access

Barges, shoreline work, and restricted access can change equipment setup and sequence.

Saturated Ground

Water and loose or variable soils can drive casing, cutoff, or ground-improvement decisions.

Existing Utilities

Buried infrastructure must be understood before drilling, excavation, or treatment begins.

Active Facilities

Operating dams, ports, and waterfront facilities can limit staging, shutdowns, and work windows.

Rock and Obstructions

Rock sockets, boulders, and difficult drilling conditions can affect tooling and production assumptions.

Verification

Testing, inspection, and installation records should align with the foundation and retention plan.

Relevant Capabilities

Drilled Shafts & Rock Sockets

Large-diameter deep foundations for heavy structural loads, over-water work, and rock-socket requirements.

Micropiles

Small-diameter deep foundations for limited access, retrofit work, and difficult ground conditions.

Secant & Tangent Pile Walls

Overlapping or tangent drilled elements for earth retention, cutoff, and excavation support.

Soldier Pile Walls

Flexible shoring systems for excavations, constrained sites, and work beside existing infrastructure.

Jet Grouting

In-place soil treatment for ground improvement, cutoff, underpinning, and utility-sensitive work.

Deep Soil Mixing

Mixed soil-cement columns for ground improvement, support, and seepage-control applications.

Featured Projects

Dam & Port Project Experience

Haapa Fishing Platform Construction

Haapa Fishing Platform Construction

Woodland, WA

Pacific Foundation installed sacrificial and production micropiles and proof tested them for the Haapa ADA Fishing Platform.

Lower Granite Dam

Lower Granite Dam

Pullman, WA

Thirty-two 54-inch drilled shafts with 48-inch rock sockets, installed through water, overburden, and hard bedrock.

Bull Run Dam 2 Tower Improvement

Bull Run Dam 2 Tower Improvement

Bull Run, OR

Shotcrete support and grouting provided earth-retention support for improvements at the operating dam facility.

Foss Maritime Dock

Foss Maritime Dock

Portland, OR

Barge-mounted predrilling used 36-inch temporary casing and grout to prepare foundations for permanent dock piles.

Lake Oswego River Intake Pump Station

Lake Oswego River Intake Pump Station

Lake Oswego, OR

Pacific Foundation's documented scope includes secant piles.

Kapalama Wharf & Dredging Project

Kapalama Wharf & Dredging Project

Honolulu, HI

Predrilling around utilities, cutter mixing, and jet grouting provided ground improvement for Honolulu Harbor infrastructure.

Pioneer Street Rail Overpass

Pioneer Street Rail Overpass

Ridgefield, WA

Pacific Foundation supported the Pioneer Street Rail Overpass project with large-diameter drilled shafts.

Washington Park Reservoir

Washington Park Reservoir

Portland, OR

Pacific Foundation supported the Washington Park Reservoir project with temporary and permanent soldier pile walls, tieback anchors, drilled shafts, dewatering, cathodic protection, instrumentation, tower-crane shafts, carved shotcrete, soil nail walls, and toe block anchors.

Pearl Harbor P-209 Dry Dock

Pearl Harbor P-209 Dry Dock

Honolulu, HI

Deep cement mix columns, secant piles, and jet grouting around utilities supported phased marine work in an active yard.

100+

Craft Labor

Self-Perform Crews

170+

Pieces of Specialty

Foundation Equipment

40+

Years of Foundation &

Shoring Experience

PNW, Mountain West

& Hawaii

Service Area

Let’s Build Together

Bring Us the Constraints Early

Share the plans, geotechnical information, access limits, and schedule. Our team can help evaluate a constructible specialty foundation approach.