Building the future
Port of Vancouver LaFarge Modifications
The Project
The improvements to the Port of Vancouver increased its efficiency, capacity, and infrastructure, resulting in streamlined operations, improved cargo handling, and enhanced competitiveness.
The Solution
This project included the installation of 60” diameter drilled shafts in saturated sands using full length temporary casing and vibratory hammer for installation and extraction of the casing.
Scope of Work
This project included the installation of 60” diameter drilled shafts in saturated sands using full length temporary casing and vibratory hammer for installation and extraction of the casing.
We Have the Right Tools For Every Job
We are equipped with a state-of-the-art fleet of drill rigs, tooling, cranes and equipment to tackle any geotechnical challenge. Our relentless commitment to client-centric solutions, safety, and innovation has fostered enduring relationships and a reputation for excellence in the construction industry.
Our innovative solutions, dedication to the job, respect for the island and Hawaiian culture, open communication and innovative solutions has allowed us to excel and foster long term partnerships in Oahu.
Call 808.272.2946 to discuss your project and speak to one of our on-island estimators today!
Large Diameter Drill Rigs
- Bauer BG 40 V (2 rigs)
- Bauer BG 33 H
- Bauer BG 28 V
- Bauer BG-25 C (With custom low-clearance modifications)
- Bauer BG-15 H
Small Diameter Drill Rigs
- Klemm 806-3F
- Klemm 401
- Comaccio MC22
- Comaccio 4D
Cranes and Concrete
- Mantis 50-Ton Crane
- RT Crane
- Scheltzke 510 Grout Plant
- Scheltzke Jet Group Pump
- Casagrande Jet Group Pump
Let's get Connected
Have a Question?
Want to learn more about our expertise or to discuss an upcoming project? Click on the button below to contact us via phone, email or contact form.