Pacific Foundation | Geotechnical Excellence

(360) 200-6608

Get in touch

a
OR126 Slide Repair

OR126 Slide Repair

To rehabilitate a section of OR126, Pacific used 50 ft steel shear piles for a Shear Wall to correct the slide on the OR126E @ M.P. 9

Stony Point Solider Pile Wall

Stony Point Solider Pile Wall

In 2016, ODOT began evaluating the I-84 corridor from Boardman to the Idaho state line, seeking solutions to improve safety and operations along the interstate.

US 101 & Hemlock Improvements

US 101 & Hemlock Improvements

In 2016, ODOT began evaluating the I-84 corridor from Boardman to the Idaho state line, seeking solutions to improve safety and operations along the interstate.

Pioneer Street Rail Overpass

Pioneer Street Rail Overpass

The Pioneer Street Rail Overpass utilized 8′ diameter drilled shafts as deep foundation elements to provide crucial support and stability for the overpass structure, ensuring long-term durability and safety.

River S Bridge Replacement

River S Bridge Replacement

The River S Bridge project involved barge-based drilling of large diameter shafts, utilizing temporary casing and slurry for stability.