Willamette Drive Soil Nail Wall

Willamette Drive Soil Nail Wall

The City of West Linn began development of the state-of-the-art Athey Creek Middle School Campus in 2021. With the campus now completed, the city turned their attention to improving traffic flow and roadway safety on Willamette Falls Drive.

OR126 Slide Repair

OR126 Slide Repair

To rehabilitate a section of OR126, Pacific used 50 ft steel shear piles for a Shear Wall to correct the slide on the OR126E @ M.P. 9

Stony Point Solider Pile Wall

Stony Point Solider Pile Wall

In 2016, ODOT began evaluating the I-84 corridor from Boardman to the Idaho state line, seeking solutions to improve safety and operations along the interstate.

US 101 & Hemlock Improvements

US 101 & Hemlock Improvements

In 2016, ODOT began evaluating the I-84 corridor from Boardman to the Idaho state line, seeking solutions to improve safety and operations along the interstate.

Pioneer Street Rail Overpass

Pioneer Street Rail Overpass

The Pioneer Street Rail Overpass utilized 8′ diameter drilled shafts as deep foundation elements to provide crucial support and stability for the overpass structure, ensuring long-term durability and safety.