Pacific Foundation | Geotechnical Excellence

(360) 200-6608

Get in touch

a
US 101 & Hemlock Improvements

US 101 & Hemlock Improvements

In 2016, ODOT began evaluating the I-84 corridor from Boardman to the Idaho state line, seeking solutions to improve safety and operations along the interstate.

Pioneer Street Rail Overpass

Pioneer Street Rail Overpass

The Pioneer Street Rail Overpass utilized 8′ diameter drilled shafts as deep foundation elements to provide crucial support and stability for the overpass structure, ensuring long-term durability and safety.

River S Bridge Replacement

River S Bridge Replacement

The River S Bridge project involved barge-based drilling of large diameter shafts, utilizing temporary casing and slurry for stability.

ODOT I-84 Snow Zone

ODOT I-84 Snow Zone

In 2016, ODOT began evaluating the I-84 corridor from Boardman to the Idaho state line, seeking solutions to improve safety and operations along the interstate.

US 95 Sound Wall

US 95 Sound Wall

Building the future US 95 Corridor Access Improvements Client: Apollo IncScope of Work: Drilled ShaftsProject Year: 2019  The Project The compensate for the population growth and increased traffic levels in Hayden, ID, the Idaho Transportation Department is...